Press systems · Leak testing and SC-Contur

Leak testing and SC-Contur: testing dry and finding forgotten pressings

The leak test is the moment in which a press system proves what it promises – and the moment in which a forgotten pressing is either noticed or disappears for years. This page explains why drinking-water installations are tested dry today, how the test runs according to the manufacturers, what the property “unpressed = leaking” achieves at Viega, Sanha and Geberit, and why threads, push-fit systems and couplings are tested differently.

Principle
leak test dry (EN 806-4), filling only before commissioning
Dry
150 mbar, at least 120 min per 100 l (+20 min per further 100 l)
Load test dry
3 bar up to DN 50, 1 bar above DN 50, 10 min, with visual inspection
Wet
1.1 × operating pressure, 10 min (metal pipe)
Unpressed = leaking
SC-Contur (Viega), UVUD (Sanha), press indicator (Geberit)
Not centrally testable
threads and unions – check by hand

Why testing is done dry today

Whoever pressure-tests a drinking-water installation with water has filled it – and a filled installation must go into operation: complete water exchange every three days to VDI 6023 part 1, at the latest every seven days to EN 806. If it stands longer, germs grow in the stagnant water, and an installation once filled can as a rule no longer be drained completely. That is why EN 806-4 requires the leak test to be carried out dry, with oil-free compressed air or inert gas, and the subsequent load test wet only if intended operation follows immediately. For everything else there is the alternative dry load test according to the leaflet of the German ZVSHK or BTGA rule 5.001.

The manufacturers follow this: in its planning manual Viega declares the dry load test permissible for all its installation systems and calls it the standard for building projects executed in lots. The corrosion assessment to EN 12502 that the designer makes beforehand also assumes a dry pressure test. The wet test is not wrong – it is only tied to the condition that water flows immediately afterwards.

Protection goal hygiene Viega puts it this way in its planning manual: human health, and with it impeccable drinking-water quality, must always be rated higher as a protection goal than the prevention of material damage. That is why the dry test is not the convenient test but the right one.

How the dry test runs (manufacturer statement Viega)

  • Leak test: compressed air or inert gas at 150 mbar; after reaching the test pressure, test time at least 120 minutes for a pipe volume up to 100 litres, 20 minutes longer per further 100 litres.
  • Load test dry: at most 3 bar for nominal sizes up to DN 50, 1 bar above DN 50, over 10 minutes – combined with a visual inspection of all joints for tightness.
  • Load test wet (if operation follows immediately): test pressure 1.1 times the maximum operating pressure to EN 806-4; test time with metal pipes 10 minutes after temperature equalisation, with plastic pipes preliminary and main test per manufacturer statement.
  • Report: the installer records the test as specified by the system manufacturer – the report is part of the handover.

The figures are manufacturer statements for the Viega systems; Sanha, Geberit and the ZVSHK codes of practice give similar values. What governs is always the current instructions for use of the system and the leaflet according to which the test is made.

Unpressed = leaking: SC-Contur, UVUD, press indicator

The visual inspection of all joints is not always possible in practice and seldom economical. That is why there are separate provisions for joining systems with the property unpressed = leaking: a connector that has not been pressed must not happen to be tight during the leak test – it must inevitably leak so that the forgotten pressing shows on the pressure gauge.

Viega SC-Contur: all Viega press connectors carry the SC-Contur, a forced leakage of the unpressed connector over the entire pressure range of the test – dry from 22 mbar to 3 bar, wet from 1 to 6.5 bar, irrespective of the sealing element; Viega guarantees the detection of unpressed joints in dry tests from 22 hPa to 0.3 MPa and in wet tests from 0.1 to 0.65 MPa. According to the manufacturer the property was tested by the DVGW and by the German public insurers' institute for loss prevention and loss research. A cylindrical pipe guide protects the sealing element during insertion.

Sanha UVUD: Sanha calls the property “unverpresst undicht” (UVUD, unpressed = leaking): before pressing, joints are visibly leaking during the pressure test, forgotten pressings can be identified reliably – for NiroSan, SANHA-Press, Therm and Heavy Steel Press.

Geberit press indicator: FlowFit makes the pressing visible with a press indicator and has defined leak paths that show the unpressed state during the test.

Show full table · more than 20 rows
Unpressed = leaking per system (manufacturer statements; availability from stock or to order)
SystemManufacturerProfile and toolUnpressed = leaking
Viega Profipress (copper)ViegaSC-Contur (Viega V profile)yes
Viega Profipress G (gas)ViegaSC-Contur (Viega V profile)yes
Viega Profipress S (solar, high temperature)ViegaSC-Contur (Viega V profile)yes
Viega Sanpress (gunmetal, stainless steel pipe)ViegaSC-Contur (Viega V profile)yes
Viega Sanpress G (gas)ViegaSC-Contur (Viega V profile)yes
Viega Sanpress Inox (stainless steel complete system)ViegaSC-Contur (Viega V profile), XL 76.1-108 with press ringyes
Viega Sanpress Inox G (gas)ViegaSC-Contur (Viega V profile)yes
Viega Temponox (stainless steel, heating/cooling)ViegaSC-Contur (Viega V profile)yes
Viega Raxofix (multilayer composite pipe)ViegaRaxofix profile (press rings 16-63 mm)yes
Viega Megapress (thick-walled steel pipe)ViegaSC-Contur, press jaws 3/8-2 inch, XL with press ring and Pressgun Press Boosteryes
Viega Megapress S (FKM, higher temperatures) and S XLViegaSC-Contur, XL with press ring and Pressgun Press Boosteryes
Viega Megapress G (gas)ViegaSC-Conturyes
SANHA NiroSan (stainless steel press system)SanhaSA, V or M profile up to 54 mm (combipress), from 76.1 SA/M, 139.7/168.3 press collars M onlyyes (UVUD)
SANHA NiroSan GasSanhaSA, V or M profile up to 54 mmyes (UVUD)
SANHA NiroSan Industry (FKM, high temperature)SanhaSA, V or M profile up to 54 mmyes (UVUD)
SANHA-Press (copper) incl. Gas and SolarSanhaSA, V or M profile up to 54 mm (combipress)yes (UVUD)
SANHA-Therm (galvanised carbon steel, heating/cooling)SanhaSA, V or M profile up to 54 mm (combipress)yes (UVUD)
SANHA Heavy Steel Press (thick-walled steel pipe) incl. GasSanhastandard profile, pressed with common press toolsyes (UVUD)
Geberit Mepla (multilayer composite pipe)GeberitMepla profile (press jaws/press rings per dimension)yes
Geberit FlowFit (multilayer composite pipe, lateral press technology)GeberitFlowFit profile (lateral pressing), two press jaws: blue d16-d40, green d50-d75, hand press tool d16-d40yes
GF iFIT (push-fit system, polybutene and multilayer pipe)GFtool-free (push-fit), modular adapter technology (d16/20 and d25/32)no (push-fit joint - test mechanism and two O-rings)
Victaulic grooved couplings (Style 77 flexible, Style 75, rigid couplings)Victaulicroll groove or cut groove, coupling with track boltsno (mechanical coupling)
Uponor RS 63-110 (modular press and plug-in system, multilayer composite pipe)Uponorpress collars MLC 63-110 with base jaw on Uponor UP 110 / UP 75 / UP 75 EL (32 kN), press adapters pre-pressed at the workbench - base bodies plugged and locked without toolsyes
Uponor S-Press PLUS 16-32 and S-Press 14, 40-75 (multilayer composite pipe)Uponorpress jaws UPP1 (14-50) and Mini KSP0 (14-32), press collars MLC 63/75 with base jaw - Uponor profile (jaw marking U), colour-coded per dimensionyes

What the property does not replace: the test itself. An unpressed SC-Contur connector is noticed only if pressure is built up, held and read – and the visual inspection remains mandatory for everything that does not have this property.

What is different with threads, push-fit and couplings

Threaded joints and unions must, according to the manufacturer, be checked by hand: an investigation has shown that they cannot be reliably checked centrally, neither with a dry nor with a wet test, neither at low nor at high pressures – an insufficiently tightened thread can be tight at 150 mbar and drip at 6 bar. At every transition to malleable iron or stainless-steel threaded fittings the joint therefore belongs in the visual inspection.

Push-fit systems (GF iFIT) have no pressing that could be missing; their check is the visible insertion depth (mark on the pipe, inspection window on the fitting) and the leak test as with every system. Two O-rings and the pull-out protection take over what bead and deformation do in a press system.

Grooved couplings (Victaulic) are mechanical joints: seat of the coupling in the groove, tightening of the bolts (manufacturer statement on torque) and metal-to-metal contact of the coupling halves are visible from outside; the leak test follows the rules of the plant (sprinklers: VdS, industry: operator).

For all of them: test before plastering, insulating or grouting. A joint you can no longer see can only be measured.

Further reading

Tools of this section: System finder (which system suits medium, pipe and size) · Joining methods compared · Cost comparison calculator · Press systems overview.

The cross-cutting topics: Mixed installation and corrosion · Press profiles and tools · Seals and media · Zeta values of press connectors

Frequently asked questions on leak testing

May I pressure-test a drinking-water installation with water?

To EN 806-4 the leak test is to be carried out dry; the wet load test is permissible if operation follows immediately (water exchange every 3 days to VDI 6023, at the latest every 7 days). Otherwise dry to the ZVSHK leaflet.

At what pressure is the dry test made?

According to Viega: leak test 150 mbar over at least 120 minutes per 100 litres of pipe volume; load test 3 bar up to DN 50 or 1 bar above, 10 minutes, with visual inspection.

What does “unpressed = leaking” mean?

A connector that has not been pressed inevitably leaks during the leak test, so that the forgotten pressing shows on the pressure gauge – at Viega SC-Contur dry 22 mbar to 3 bar and wet 1 to 6.5 bar, at Sanha UVUD, at Geberit via press indicator and leak paths.

Does the SC-Contur replace the visual inspection?

For the press connectors with this property there are separate provisions; threaded joints, unions and all joints without this property must still be checked by hand.

Why can I not test threaded joints centrally?

Because an investigation (manufacturer statement Viega) has shown that an insufficiently tightened thread can be tight at one test pressure and leaking at another – not reliably detectable either dry or wet.

How is a push-fit system tested?

Via the visible insertion depth (mark, inspection window) and the normal leak test. There is no forgotten pressing; a pipe inserted too short is noticed in the visual inspection.

Looking for a test report or test equipment?

We supply the systems and tell you which manufacturer statement the test follows – and which transitions belong in the visual inspection.

Send an inquiry

Your inquiry to Zickwolff

Send us what you have – designation, standard, quantity, date. We will clarify the rest with you.

← Back to the press systems overview

Sources: Viega planning manual industrial technology 08/2026 (SC-Contur and double pressing; planning notes dry leak testing), Viega press connection systems 09/2024; Sanha NiroSan brochure 08/2026 (UVUD); Geberit FlowFit 05/2024 and supply systems 07/2025; GF iFIT 12/2023; Victaulic I-100. EN 806-4, DIN 1988-200, EN 12502, VDI 6023 part 1, ZVSHK leaflet leak testing, BTGA rule 5.001.